San Diego, CA
Status: Completed in 2006
| Owner | Hard Rock Hotel |
| General Contractor | Turner Construction |
| Reinforcing Steel Sub-Contractor | RCI |
| Structural Engineer | KPFF |
| Architect | Carrier Johnson |
Situated at the entrance to the historic Gaslamp Quarter in downtown San Diego, this premier new development includes condo/hotel, parking, restaurant, and retail components. 432,000-sf, 12-story structure with two levels below grade.
Estimated construction cost is $75 million. BauGrid® was used in this 12-story Mixed Use, poured-in place concrete building.

