Folsom, CA
Status: Completed in September 2012
| Owner | California Independent System Operator (ISO) |
| Project Manager | Vanir Construction Management, Inc |
| Design-Build Contractor | Clark Deisgn-Build of California, Oakland, CA |
| Precast Concrete Supplier & Sub-Contractor | Midstate Precast LP, Corcoran, CA |
| Structural Engineer | Buehler & Buehler Structural Engineers, Sacramento, CA |
| Architect | Dreyfuss + Blackford Architecture |
Headquarters for a California high Voltage Electric Grid operator, this LEED Platinum building consists of three wings, designed to meet three distinct functional requirements. A Precast hybrid Moment Frame System was selected for cost, seismic and aesthetic reasons. The precast columns are reinforced with BauGrid® Reinforcement System.
- 2011 DBIA Western Pacific Design-Build Award (Office)
- 2011 ENR Western Pacific Best Project Award (Office)