California ISO- Iron Point Headquarters

Folsom, CA

Status: Completed in September 2012

OwnerCalifornia Independent System Operator (ISO)
Project ManagerVanir Construction Management, Inc
Design-Build ContractorClark Deisgn-Build of California, Oakland, CA
Precast Concrete Supplier & Sub-ContractorMidstate Precast LP, Corcoran, CA
Structural EngineerBuehler & Buehler Structural Engineers, Sacramento, CA
ArchitectDreyfuss + Blackford Architecture

Headquarters for a California high Voltage Electric Grid operator, this LEED Platinum building consists of three wings, designed to meet three distinct functional requirements. A Precast hybrid Moment Frame System was selected for cost, seismic and aesthetic reasons. The precast columns are reinforced with BauGrid® Reinforcement System.

  • 2011 DBIA Western Pacific Design-Build Award (Office)
  • 2011 ENR Western Pacific Best Project Award (Office)